Property photos
Just added
New home
£65,029
€74,500 (€121/sq. ft)
1 bed apartment for sale
Sole Vento, Sunny Beach1 bed
1 bath
614 sq. ft
Local area information
Property location
Nearby amenities
Features and description
- Balcony
- Single garage
- Off street parking
- Porter/security
- Guarded complex
- Walking distance to the sea
- Internal infrastructure
- For year-round living
A one-bedroom apartment is available for purchase in the new residential complex Sole Vento, currently under construction in the popular resort of Sunny Beach. The modern building will be located just 660 meters from the coastline and sandy beach.
The complex will operate with a low maintenance fee.
The property has a total area of 57 sq.m and a living area of 50 sq.m, and will be situated on the first residential floor of a building with an elevator.
The layout includes a separate entrance hall with a small storage space, a zoned living room, a bedroom, a bathroom with a shower, and a spacious balcony.
The apartment can be purchased either unfurnished or fully furnished — ready for immediate use or rental — with a fitted kitchen, equipped bathrooms, lighting, and air conditioners.
Sole Vento is a residential complex under construction, offering 64 turnkey apartments with a low maintenance fee. The modern building will be located just 660 meters from the sandy beach of Sunny Beach.
This modern residential complex, without a swimming pool, will feature landscaped areas with relaxation zones, video surveillance, and controlled access. The complex will also include a reception area and a property management company offering maintenance services and rental support for owners.
The grounds will offer outdoor parking with 23 parking spaces. Additionally, the project includes an underground garage with 42 enclosed parking units, each with a private gate and individual identifier.
Sole Vento will be located in a quiet part of Sunny Beach, within walking distance of shops, restaurants, pharmacies, and other social and resort infrastructure.
A payment plan with up to two years of interest-free installments is available. A longer-term installment option is also possible, with interest.
Payment plan:
• Deposit: €2000
• At the start of construction: 40%
• Upon Act 14: 30%
• Upon Act 16: 30%
• Installment plan available for up to 4 years at 6% annual interest on the remaining amount.
Construction begins: October 2025
Estimated completion time: 2 years
The complex will operate with a low maintenance fee.
The property has a total area of 57 sq.m and a living area of 50 sq.m, and will be situated on the first residential floor of a building with an elevator.
The layout includes a separate entrance hall with a small storage space, a zoned living room, a bedroom, a bathroom with a shower, and a spacious balcony.
The apartment can be purchased either unfurnished or fully furnished — ready for immediate use or rental — with a fitted kitchen, equipped bathrooms, lighting, and air conditioners.
Sole Vento is a residential complex under construction, offering 64 turnkey apartments with a low maintenance fee. The modern building will be located just 660 meters from the sandy beach of Sunny Beach.
This modern residential complex, without a swimming pool, will feature landscaped areas with relaxation zones, video surveillance, and controlled access. The complex will also include a reception area and a property management company offering maintenance services and rental support for owners.
The grounds will offer outdoor parking with 23 parking spaces. Additionally, the project includes an underground garage with 42 enclosed parking units, each with a private gate and individual identifier.
Sole Vento will be located in a quiet part of Sunny Beach, within walking distance of shops, restaurants, pharmacies, and other social and resort infrastructure.
A payment plan with up to two years of interest-free installments is available. A longer-term installment option is also possible, with interest.
Payment plan:
• Deposit: €2000
• At the start of construction: 40%
• Upon Act 14: 30%
• Upon Act 16: 30%
• Installment plan available for up to 4 years at 6% annual interest on the remaining amount.
Construction begins: October 2025
Estimated completion time: 2 years
Floor plans and tours
Floor plans
No floor plan available
Tours
No virtual tour available
More information
Listed by
Property descriptions and related information displayed on this page are marketing materials provided by - Lev Estates. Zoopla does not warrant or accept any responsibility for the accuracy or completeness of the property descriptions or related information provided here and they do not constitute property particulars. Please contact Lev Estates for full details and further information.